Elimination of water wasting problems within the WATAN camp in Kafr Jals – WATAN

Elimination of water wasting problems within the WATAN camp in Kafr Jals

WATAN launched a project to maintain water units in WATAN camp in Kafr Jals, one of the activities of a multi-sectoral project; With the aim of optimizing water access and reducing waste, WATAN field teams implemented during the month of October 2022:

tank float, number 1560

Starter – 50 mm 15

Starter – 75 mm 5

Iron tap – 50 mm 1

Plastic water taps 1960

Polyethylene pipes 75 mm, pressure 6 bar, 30

Polyethylene pipes 50 mm – pressure 6 bar 30

Quick Connect – 50mm 20

Quick Connection – 75 mm 4

Teflon tape 50

Swaddles – 50 mm 21

Swaddle – 75 mm 10

Copper starter PP – 50 mm 6

Copper starter number PP – 75 mm 6

WATAN teams also published an announcement to reach workers to work within the project and benefit from it, as 50 workers from the camp’s residents were employed and benefited financially from the project as it provides them with a cash-for-work service.

DECLINE